Reinstall All Panels; Return And Discharge Duct Flanges - Bosch SM024 Installation, Operation And Maintenance Manual

Sm series
Table of Contents

Advertisement

SM Series Heat Pump
8. Swap FRONT panel (containing LCD) to the
BACK

Reinstall All Panels

1. Re-route the LCD wiring to the new location
and reconnect LCD screen wiring. Reinstall
panels. (Figure #84)
Panel containing LCD and Bosch Logo must be
installed on the same side as Electrical Box.
Figure # 84
NOTE: When re-installing panel, the "RED"
cable from the LCD connector must be
connected to the "R" terminal of the LCD
PCB. The LCD will not work any other way.
2. Reinstall belts. (Figure#85)
Figure # 85
Revised 02-15

Return and Discharge Duct Flanges | 25

RETURN AND DISCHARGE DUCT
FLANGES
Return and discharge opening duct flanges are
shipped unfolded. Flanges bend lines are
perforated allowing easy bending using standard
sheet metal pliers or channel locks. (Figure #90)
Bend flanges one at a time.
6 720 220 406 (2015/02)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smo60Sm070Sm036Sm048

Table of Contents