A screen appears with the server BIOS and CIMC firmware versions. Answer the prompt, "Have you
Step 8
read the Cisco EULA" (end user license agreement)?
The Host Upgrade Menu screen is displayed.
Select the option to Update UCS P81E VIC. This will update the card firmware and uboot image to the
Step 9
required level.
Step 10
Select the option to Update CIMC Firmware. This will update the CIMC firmware.
Step 11
Verify the firmware levels on the next screen.
Select the option to Reboot the machine.
Step 12
When you see the F8 prompt during rebooting, press F8 to open the CIMC Configuration Utility.
Step 13
In the CIMC Configuration Utility, select the option CIMC Factory Default, then press F10 to save
Step 14
your changes.
Return the cables from the FEXes to the 1-Gb LOM ports on the server.
Step 15
Recommission the server in UCS Manager.
Step 16

Integrated Server Power States vs. Service Profile Power States

If the desired power state for a service profile associated with an integrated C-Series server is set to
Down, using the power button or Cisco UCS Manager to reset the server causes the desired power state
of the server to become out of sync with the actual power state and the server may unexpected shut down
at a later time.
To safely reboot a server from a power-down state, use the Boot Server action in Cisco UCS Manager.
The following table shows how the physical server power states can differ from the UCSM service
profile power states when the power button on the server is used.
Initial Service
Profile Power
Server Initial
State
Power State
Down
Off
Up
On
OL-20887-02
Press y to accept the EULA and continue the update.
Press n to read the EULA. The EULA is displayed and you are prompted to press y to continue the
update, or n to cancel. If you press n, the server will reboot without updating.
Press q to exit without updating. This selection reboots the server.
Action From
Physical Power
Button
Push button to turn
On
Push button to turn
Off
Actual Power State
Power State Under
of Server After
UCSM Equipment
Action Was Taken
Tab
On
On
Off
Off
Cisco UCS C210 Server Installation and Service Guide
Desired Power
State Under
Service Profile
Down
Up