Vertical Penetration Framing - Heat & Glo 6000GL-IPI-R Owner's Manual

Hide thumbs Also See for 6000GL-IPI-R:
Table of Contents

Advertisement

C.

Vertical Penetration Framing

WARNING
Fire Hazard
Keep loose materials or blown
insulation from touching the
vent pipe.
National building codes recommend us-
ing attic shield to keep loose materials/
blown insulation from contacting vent.
Hearth & Home Technologies requires
the use of an attic shield.
Installing the Ceiling Firestop
• Frame an opening 10 inches by 10
inches whenever the vent system
penetrates a ceiling/fl oor (see Figure
6.4).
Frame the area with the same sized
lumber as used in ceiling/fl oor joist.
• When installing a top vent vertical ter-
mination appliance the hole should be
directly above the appliance, unless the
fl ue is offset.
• Do not pack insulation around the vent.
Insulation must be kept away from the
pipe.
Installing Attic Shield
Note: An additional ceiling fi restop is not
required if attic shield is used.
• Frame opening for attic shield.
• Attic shield may be installed above or
below ceiling (see Figure 6.5).
• Secure with three fasteners on each
side.
• Fold tabs at top of attic shield in toward
vent pipe. Tabs must keep vent pipe
centered within shield.
• Field construct additional shield height if
insulation is deeper than height of attic
shield.
A
B
DVP
PIPE
Figure 6.4
ATTIC SHIELD INS TALLED
BELOW CEILING
Figure 6.5
Heat & Glo • 6000GL-IPI-R, 6000GL-IPI-S • 2102-900 Rev. B • 5/06
A
B
10 in. 10 in.
BEND TABS IN
AROUND PIPE
3 FASTENER S
PER SIDE
Installing the Attic Shield
ATTIC
ABOVE
ATTIC SHIELD INS TALLE D
ABOVE CEILING
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

6000gl-ipi-s6000gl-ipilp-r6000gl-ipilp-s

Table of Contents