Horizontal Termination - Empire Comfort Systems DVP36PP32EN-3 Series Installation Instructions And Owner's Manual

The direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVP36PP32EN-3 Series:
Table of Contents

Advertisement

NOTE: Termination cap should pass through the wall firestop from
the exterior of the building. Adjust the termination cap to
its final exterior position on the building.
WARNING: Termination cap must be positioned so that arrow
is pointing up.
Attach the termination cap with the four wood screws provided.
Before attachment of the termination, run a bead of silicone sealant
rated above 250°F on its outside edge too, so as to make a seal
to the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate
fasteners for use on stucco, brick, concrete or other types
of siding.
CAUTION: If exterior walls are finished with vinyl siding (or materials
that could become discolored or warp), it is necessary to install a
vinyl siding standoff.
The vinyl siding standoff will be installed between the vent termination
and the exterior wall. See Figure 52. This horizontal vent termination
bolts onto the flat portion of the vinyl siding standoff, so an air space
will exist between the wall and the termination cap.
For installations requiring a vertical rise on the exterior of
the building, 14-inch and 36-inch tall Snorkel Terminations,
as shown in Figure 53a are available. Follow the same
installation procedures as used for standard Horizontal
Terminations. If the Snorkel Termination must be installed
below grade (i.e. basement applications, proper drainage
must be provided to prevent water from entering the Snorkel
Termination. See Figure 53b. Do not attempt to enclose the
Snorkel within the wall or any other type of enclosure.
Page 38

HORIZONTAL TERMINATION

Figure 52
SNORKEL
Figure 53a
SNORKEL
ADEQUATE
DRAINAGE
Figure 53b
30786-3-0614
12 INCHES
MINIMUM
12 INCHES
MINIMUM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents