Porter-Cable 557 Instruction Manual page 19

Double insulated plate joiner
Hide thumbs Also See for 557:
Table of Contents

Advertisement

7.
Hold tool firmly as shown in Fig. 28, and squeeze trigger switch to start
tool.
8.
At a slow, steady pace, push tool forward in base as far as depth stop
allows.
9.
Release trigger switch to stop tool and remove tool from work.
10. Repeat Steps 5 through 8 until all the grooves for this joint are
completed.
NOTE: Assemble all joints and verify alignments before applying
glue (see Fig. 29).
Fig. 28
19
Fig. 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents