Mitsubishi Electric PKH18FK1 Technical & Service Manual page 61

Series pkh wall mounted/series pch ceiling suspended/series plh ceiling cassettes
Table of Contents

Advertisement

OPERATING PROCEDURE
8. Removing the louver motor and vane motor
Remove only the right side panel to remove these motors.
(1) Remove setting screws of each motor. (2 pcs each, total 4
pcs) (See photo 6)
9. Removing the swing louver
(1) Remove the swing louver from the joint on the right side.
(2) Slide the louver out to the left side.
10. Removing the lower louver
(1) Pull down and unhook the clasps. (3 points)
(2) Warp the louver to remove.
11. Removing the auto vane.
After removed the lower louver:
(1) Remove a fixing screw of the left side box and the lover
panel.
(2) Pull the left side box outward.
(3) Remove the auto vane shaft from the joint.
(4) Slide the auto vane out to the right side.
12. Removing the vane crank
The vane crank will be removed easily after removed the auto
vane.
13. Removing the front louver
(1) Pull and unhook the louver toward you. (Clasps are 5 pcs)
Photo 6
Lower louver Side box (L)
Photo 7
Vane motor set
screws
Side box
Right
Photo 8
Side box
left
OC193-59
PHOTOS
Vane motor
Side box (R)
Louver motor
Support bar
Thermistor
Louver motor
check plate
set screws
Thermistor
Side plate (S)
Lower louver
Front Panel
lower
Swing louver
Auto vane
Vane crank
Front panel
lower
Set screw

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents