Haier HFU-09HA03/R2(DB) Operation Manual page 26

Floor unit
Hide thumbs Also See for HFU-09HA03/R2(DB):
Table of Contents

Advertisement

Installation Manual of Room Air Conditioner
Tool necessary
1.Screw driver
2.Hacksaw
3.70mm dia. hole core drill
4.Spanner(dia.17,27mm)
5.Spanner(14,17,27mm)
6.Pipe cutter
7.Flaring tool
8.Knife
9.Nipper
10.Gas leakage detector
or soap water
11.Measuring tape
12.Reamer
13.Refrigerant oil
Standard accessories
Following parts shall be field
supplied
Mark
Part name
A
Adhensive tape
B
Pipe clip
C
Connecting hose
D
Insulation material
E
Drain hose
Fixing of the unit
1. Position of the wall hole
Wall hole should be decided according to installation
place and piping direction.(refer to installation drawings).
2. Making a wall hole
Drill a hole of 120x70mm dia. with a little slope towards
outside.
No.
Shape and description
140
500
113.5
Indoor side
25
Remote controller
Drain hose
Plastic cap
Drain-elbow
Self-tapping screw
Rubber pad
dry battery #7
HFU-09HA03/R2(DB)
HFU-12HA03/R2(DB)
140
HFU-18HA03/R2(DB)
113.5
583
Outdoor side
Wall hole
(Cross section of wall hole)
QTY
1
1
4
1
4
4
2
Thickness
of wall

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfu-18ha03/r2(db)Hfu-12ha03/r2(db)

Table of Contents