Vent And Ir P Iping And Boiler Con- Ections; Follow Termination; Direct Exhaust Only; Direct Exhaust - Weil-McLain GV90+ Installation And Start-Up Manual

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+ Series 2
OAIS-fiMD WA.TU ua.Le" -
Boiler ManuaJ
Vent and air piping and boiler connections
DIRECT EXHAUST
&
DIRECT VENT
Follow termination
Instructions
1,
Reali
and
foUU\V
all
insLruction.~for
dlt
ltf10itt.a~\fo
<
YP"
used
~fore
p:ro...,l'iling
widt
thi>l
page.
Installing vent
and air
pipi
ng
1~
\\'ork, IToD'I Lhe.
boitr=(
l'
O
~ent
(
;t
air
f['_nninati
bl\'. Dtt
not
ext~
the lengths
gi
v~u
in
the:
prt-Yious
pagc;-
fOr
tilhn
the air
or
\lt'
H
t
piping.
a.
"Provkle"f <
Mintess-pipc-ro I'VCad.aptmobUlj11ed
from tht &l1l.i"nlts!i
pipe
manufadurer
ror
con·
nection$ at
the
boile:r'lud at
ttnnituarion~
whe:n
r<qulrod.
2.
s..,
Figure
59
fbr
atta<bing V<n! (BJJd
oii
)
~ip
..
at
the.
OOila
3.
Cut
pip< I<>
r<quir<d
l<ngths.
4.
Dtburr inside and oubide o(
pipt-
t nd$.
5.
dla.Jt&(er
ourside
ul'
tad1
pipe-cud
tO
eusure
eVt:n
cement
di:Stribution when
join.
i
ug~
6,
Clean
all
pipe ends and
fittings.
Dry
thorou_gbly.
1.
Dr)'
a.Meml
~)e
tnlirt
vent or air pipiu.g
tb
en5'1.lTt
proper fit before assembUng·auy joint.
8.
For
each joint
a.
Handle
fittings
and
pipes carefully
to
prevent
contamination of
surfaces.
b.
Apply
primerlibernlly
to
both
joint
surfaces-
pipe
end
and fttting socket.
c. While
primer
is
srill
damp, lightly
appl)•
ap-
proved cement
ro
both
surfaces in a unifonn
coaring.
d. Apply
a seoond
coat
to
both
surfaces.
Avoid
using
too
much cement
o
n
sockets
to
p rt•tent
cemenr b
uildup inside.
e. With cement
still
wet,
insert pipe into
fit-
ting. twisting
!4
turn.
Make surt p ipt
i.s
f'ully
inserted.
(.
Wipe
~cess
cement from
joinL
()leek
joinr
to
bt sure
a smooth
bead
of
cement
shows around
the
tnrire
joinL
9.
Maintain
minimum dearance off'
t
e
inch
btcween
\'fnt
pipt
and
any
comb
ustible wall o
r
material.
10.
Seal wall
or floor
penetration
openin~
following
local
code
requirements.
DIRECT EXHAUST ONLY
IAWAIUIIHOI
48
DIRECT
EXHAUST installations- air
lnktt opening
prottctfon:
Ob
tain a
b
ird
screen
(si2ed
for
aii
inlet
fitting)
from
Wtii-Mclain.
Insert
the bird screen into
the
aii
inlet
fitting
to
prevent
foreign
objects
from entering the
opening.
Agure
59
Boiler
vent
and
air
<;oonections
Vent
aooptar
-
- --!---,
Air
lnlotfitHn9
IAWARMIN&l
AU94G
Vt1rl
pipe
-
If ""OS Al294Cstainl<>.<
Vt11lp1pt,
you must
install
an
AL29-4CstainJess
vent
starte-r
at
the
boilet
\•ent conn«tion (and at the
etnnination
if
using
the WeiJ-Mclain
plate o
r
the
concentr
ic
termination}.
Use only the
starter
made
b)•
the
vent
p ipt:
manufacturer.
Set' Replacement parts
section fo
r
available AL29-4C
stainless
vent
starterS.
I.
PVCIABS
pipe-
Clean and
deburr
inside and Out:$ide
of
other
both
ends
of
air
and
vt-nr
pipes.
Chamfer
boiler
end
of
w nr
pipe
for
ease of insertion.
IAWARHIH&j
The venr pipe end
must
be
smooth
1U1d chamfered to
prt•ttnt
possible damage to sealing gasket in \·tnt
pipe
adapter.
2.
inspect
vent
adapter and
aii
inlet fitting
(above)
-
verify no
ob-
structions
Or
foreign
objects
inside.
3.
Vent
pipt
LooSbl
vent
adapter
clamp screw.
Measure
3Y:t
inches
from
boiler
end
of
vent
pipe
and make a
mark
with felt-tip pe-n.
Apply
small
amount of silicon grease to
boiler
end of vent
pipe
to ease instrtion.
Insert
vent
p ipt
into
adapter
to depth
of
felt
tip pen
mark.
Securt
vent
pipe
b)•
tightening tht adapter damp
Steurtt)•.
Do
not
over tigtlten
.
Tht
seal is
accomphshed with tht internal
gasktr.
The clamp
is
only
10
hold rht
pipt
in
plact.
"
I A "w
"' A R,..,;
Hi i ;
;N.,Gj
D<>
not
appl)•
uces.
s ive f?n:e
or
bend rhe vent adapter
o
r
\·tnt p
ape
when
1nserting.
Tht
adapttr
o
r
seaJ
could
be damag<d.
4.
Air
pipe
Clean tht outtr surface
of
tht boiler tnd
of
the a
ir
pipe.
Apply
silicon stalanr
(Dow
Corning
?32TW
o
r
eq_uivaJenr)
to
the
outside tnd
of
the air
pipe
and to the
inside of
the a
ir inlet
fitting.
Insert
the au
pipe
into
the
aii
inlet
fining and
give
a 1/4
twn
to ensure
coverage.
Support u
ntil
the
sealant
has
d
ried.
P-an
number
550-142-783/1012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents