Weil-McLain GV90+ Installation And Start-Up Manual page 46

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER BOILER -
Boiler
ManuaJ
DIRECT VENT -
Vertical with
3"
concentric
(cononuedJ
Mount
concentric termination
I.
Mount
the termination •s shown
in
Figurt
57,
page 46.
2. Supporr
the
conc~ntric
vent/air
termination
at
the
roof
pe-netratio
n
as
shown
in
Figure
57.
The
supports/b
racing
used must
support
the
terminatio
n
~mbly
to
pre\rent \'frtical
slippage
or sideways
movement.
The
damps
used on
the
outside
of the
termination
pipe
mus~
n
or
cur into
the
pipe
or
contain sharp
edges thar could
cause
a
crack
to
fomL
The
\'tnl
and
air
piping mu.sr
bt
secure-ly
support~,
md
must
not
rest
its
weight
on the boiler
fittings.
DO
NOT
drill
or
SCTtW
in
ro
t ither
the vent pipe
or
air
pipe.
Failure
to
proprrty
support
rhe •
;
ent
and air
piping couJd
result in vent
piping
dimage.
resulting
in
possible
sewr~
personal
injur)',
death o
r
substantial
property
damage.
·
w hen inserting the partially-assembled
termination
kir through
the
roof
penetration.
wrap
plastic
or other
protection
O\'fr
the
end
of the exposed assembly ro
p
rt
-
\'fnt
debris
from
entering
the
pipes.
If
the
air
passages
become
b
locked, the boiler
will n
or
operate.
Once the
rain
cap has
been
cm1mted
to
the assembly.
there
is
no
way ro
co
rrecr
the
prob
lem.
The
a.ssembt)•
would
have
ro
be
replaced if ir
were
cut
to
be
removed
and
deaned.
Altering
lhe aSSt-mbly in any way
could result
in
severe.
persoruil injury or
death due
to toxic
flue
product emls-
sion.s.
When
usJng AL294C
srainless vent
pipe.
use
the
vent
pipe
manufacrurtr's
PVC adapter
when
connecting
t()
rhe concentric vent attachment.
IAwAR-.ol
Do
not connect
any
o rher appliance
to
rhe • tent
pipe
or-
multiple "boilerS
ro
a common
\'fnt
p
ipe.
3.
After
rhe
assembl)•
has
b«-n posiriontd
in
the roof
opening and
aU
supporrs have
been
attached,
install
a b
ird
screm
(purchased
separately
if n ot included
wirh
the kit)
and rain
cap as
follows:
46
a.
Place the
bird
screen
on
the e nd of
tht
inner p
ipe
as
in
Figure
58,
page 47.
b.
Cement the
rai[ll
cap in
place.
Figure 66
Vertical termination
-
3" PVC
concentric
-
single
or
multiple
boii!I(S
Figure
01
3
'
PVC
concentric
18fJTlinalion
supports
Alt
plpong
(bj
.......
•l
Aut
numb« SSG-I 47-1'1Uf'l()l'2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents