Page 1
Series 2 Gas-Fired Water Boilers Manual Addendum — Venting This Addendum needs to be used in conjunction with the GV90+ Series 2 Boiler Manual P/N 550-142-903_1016. ATTENTION to installers and homeowners of GV90+ boilers. KEEP THIS ADDENDUM WITH BOILER MANUAL Polypropylene Vent Systems Approval This addendum must only be used by a qualified heating installer/service technician.
Page 2
GV90+ Series 2 - Manual Addendum - Venting fired water boiler Venting & air piping — general REPLACES MANUAL PAGE 29 GV90+ Boilers must be vented and sup- plied with combustion and ventilation air using piping and methods described in this manual Every boiler must have its own vent common vent with any other appliance.
Page 3
S636 compliance is required. For ULC S636 compliance, all pipe, fittings and cement must be IPEX System 636. When using IPEX kits, use only IPEX product code 196006 for 3” venting. Contact Weil-McLain for ordering information and availability of Weil-McLain venting kits. Polypropylene - Separate pipe and concentric termination by respective manufacturers.
Page 4
AL29-4C vent piping — Install a PVC-to-stainless adapter supplied by the vent pipe manufacturer at the boiler vent connection and at the termination (when using Weil-McLain plate or concentric PVC termination). DO NOT mix piping from different vent pipe manufacturers unless using adapters specifically designed for the purpose by the manufacturer.
Need help?
Do you have a question about the GV90 Plus and is the answer not in the manual?
Questions and answers