Direct Vent Sidewall With Concentric - Weil-McLain GV90+ Installation And Start-Up Manual

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER so1un
-
BaUer
Manua
l
DIRECT VENT -
Sidewall with
3"
concentric
Allowable
vent/air
pipe materials &
length
a
I.
The
3"
concentric ttrminarion
kit
must be
pur-
chased separately.
IAWARHIN
G
I
Useonl)'the
vent
materials and kits listed
in
Figure
40,
page 33. Provide
pipe
adapt-
ers if
specified.
2.
locate the termination such
rhar
the
total
air
piping
and
vent
piping from the
boiler
ro the termina
-
tion
wiJJ
nor exceed the
maximum
length
gi\ren in
Figure 39, page 32,
3.
This termination
~qui
res
a
45-degree
e-lbow that
is
not
supplied with
the
terminatio
n
kiL
The
maximum
vtn.tlair
pipe
lengths
include aJJowance
fo
r
this elbow.
Determine
termination location
I.
The conct-nrrk termination
kir must
be
insraU
ed
as shown in Figure 50, page 41.
2. The
termination
must comply with dearances and
limitations
shown in
Figure 41, page
35.
3.
Locate the termination so iris
not
likely
tO
be
dam-
aged
by
for~ign
objects, such as stones or balls, o
r
subj<!<t
to
buildup
of
leaves or
!Miment
Multiple vent/air
terminations
I.
·
w hen re:rminating multiple GV90+ boilers. install
each conct:ntric
termination
as described in this
manual.
IAWARHING
I
All
v~n
t
pipes
and
air
inlets
must
ter-
min.are
at
the same height to avoid
pos-
sibility of
severe
personal
injury.
death
or
substantial
property
damage.
2.
Plac~
wall
penetrations
to
obtain
minimum
clearance
as shown
in
Figure 51, page
4
2
for
U.S.
installations.
For
Canadian insrallations. prO\ride
clearances required by CSA
8149.1
o
r
8
149.2
In-
Stallation
Code.
3.
The air inlet o.f a GV9G+ boiler
is
parr
of a dirtct
vent
connection.
It
is
not
dassified as a
forced
air
intak~
wirh regard to spacing from adjacent boile:r
vents.
Part number 550-1+2-783/1012
Fi
gure.
60
INSTALLATION
SEQUENCE
-
Concenlric hofizontal
·-·
Sttp
1
c::_NT
To boiler
Read
and fo:llow
all
instructions in this
manual.
DO NOT
proCCKid
wtth
venValr
In stallation until
you hav• r•ad
page 29!hrough page
35.
Step 2
lnstaJI
the
b<>iler in
a
location
that
aJJows proper routing
of
all
\-tnt
and
air
piping ro the selected
sidewall
location.
Step 3
Make
sur~
tile selected
sidewall
re:rmination
location com-
plies
with
Mgu~
41. page 35.
(Multi
pi~
boiler concentric
terminations
must
also comply
with
Figur~
St. page 42.)
Step
4
Use
onl)•
the
v~nt
materials listed
in
Figur~
40.
page 33.
PrO\'ide
pipe adapre:rs where
required.
Step 5
Vent piping and
air
piping
l~ngths
must
not
exceed the
\<alues
shown
in
Figur~
39.
page 32.
Step 6
The concentric termination must
be
assembled and
insraU
td
befor~
piping
from
the
boil~r
ro the termination.
Step 7
Prepare
the s
idewall
penetration -assemble
th~ conc~ntric
termination
kir and
secur~
the
cover
plates
as instructed
in
this
stction.
PrO\rid~
the
su..r.ports
indicated and mount
rh~
termination assembly.$«"
'
Install
t~nni natio
n
-
concen
tric
pipes"
on
page 42.
Step 8
lnstaJI
venr and
air
piping between the
boiler
and the
concentric
\~n tlair
termination.
Slope horirontal
piping
downward t-oward the
boiler at
least
1/4
inch per foot.
See
pag~
48
for
g~neral
guidelines.
S!tp 9
Install
pipe supports every 5
feet
on both the
horizontal
and
\rtrtical
runs.
Step 10
lnstaJI
a hange:r
support
within 6
inches
of any upturn
in
the
piping.
41