Concentric - Weil-McLain GV90+ Installation And Start-Up Manual

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER BOILER -
BaUer
Manual
DIRECT VENT -
Vertical
with
3"
concentric
Allowable
vent/air
pipe materials &
length
a
I.
The
3" concentric ttrminarion
kit
must
be
pur-
chased separately.
IAWARHIN
G
I
Use
only
.
the
vent mare
rials
and
kirs
listed
in
Figure
40,
page
33.
Provide pipe
adapters if specified.
2.
locate
the
termination such rhar
the
totaJ
air
piping
and vtnr
piping f'rom
the
boiler
to the
termination
will
not
tx~d
the
maximu
m length g
iven
in
Figure 39, page
32.
3.
This
termination
~qui
res
a
45-degree e-lbow
that
is
not
supplied with
the
terminatio
n
kiL
T
he
maximum
vtn.tlair
pipe
lengths
include
aJJowance
for
this
elbow.
Determine
termination location
Locate
the
concentric
•tent/air termination
using the
following guidelines:
I.
The
concentric vent/air assembly
must terminate
as shown
in
Figure 56,
page 46.
2. The
terminatio
n must comply
with the
clearances
and
limit:ation.s
shown
in
Figur~
41.
page 35.
3.
Locat~
the
termination so
it is
not
likely to
be
damaged by
foreign
obj«rs,
such
assrones
or
balls,
or subj«r
to buildup of lea\'fS
or
sediment.
4.
For
Canadian installations.
follow
r~uirt:ments
of
CSA
8149.1
O< Bt49.2
1nstallation Code.
Multiple vent/air
terminations
I.
\Vhen rerminating multiple
GV90+
boilers.
install
rhe
concentric
\'fntlair termination
assemblies
as
described
in
thi.s
manual.
IAWARNING
I
All ....
~
nt
outJets
musr
rerm inate ar rhe
same
heighr to a\'Oid
possibiliry
of
se..,·~re
pers.onal
injur)'•
d~arh
or substantial
property damage.
2.
Pl
ac~
roof
penerrarions ro
obrain
m inimum
of
12
inches
b
etwft'n centers
of
adj
acent
vent
pipe of
another
boiler for
U. S.
installations
(s~
Figure
SO,
page
46).
3.
The
air
inlet o-f a
GV9G+
boiler_
is
parr of
a dirtct
vent
connection.
It
is
not
dassified as a forced
air
intak~
wirh
r~g.ard
to S-pacing
from
adjarenr boiler
\'fnts.
Prep
are
roof
penetrations
I.
Roof
penmation
hole:
a.
Cut a 5-inch diameter hole to
clear
the 4'11-inch
terminatio-n
outside
diameter.
b.
lnserr a
gah'lllliud
meral
thimble
in
rhe
v~nt
pipe
hole.
2.
FoliO\•
all local
codes
for <solation
of
vent
pipe
when
passing
through
floors,
ceilings
and
roof<
3.
Provide
flashing
and sealing boots slud for the
concentric
term
ination
outside diameter.
Part
number
550-1+2-783/1012
Fig ure 56
INSTALLAn
ON SEQUENCE
-
Concentric
vertical
•.
to~>qoo,.
Step
1
Read
and
follow
all
instructions
in
this
manuaL DO NOT
proceed
with
ventlalr lnstallatton until you have read
pago 29
through
pago 35.
Step 2 t nsrall
the booiler
in
a
location
rhat
allows
proper
routing
of
aU
vent
and
air
piping
to the
selecrtd
sidewaJJ
location.
Step 3
Make sure
rh~
St'lected
v~rtical
t~mi
narion
location
com-
plies with
Figure 4
1
,
page
35.
(Multiple
boiler
concentric
t~nni
natio n.s
musr
also
comply
with
Figurt
56,
page
46.)
Step
4
Use only the
\'fnt
materials
lisrtd in Figure 40. page
33.
Provide
p
i
~ adapt~rs wh~~
r~ui
red.
Step 5
v~nt
piping and
air
piping
lengths
must
not
exceed the
values
shown
in Figure
39,
page
32.
Step 6
The concentric
termination
musr
bt assembled and
installed
before piping from the
boiler
to rhe
termination.
Step 7
Prepare the
'
v trtical penetration(s)- assemble
the
concen-
tric
tennina.tion
kit
and secure the
penetration
components
as
instructed in
this
section.
Provide the
'
'!£ports
in
dicat~
and
mounr the
terminarion assembly.
See Prepare roof
penetrations•
on
page
45
and "Mount
concentric
lermina·
tion"
on
page
46.
Step 8 t nsrall
..,
-
~nt
and
air piping
between
the boiler
and
the
concentric
w-nr/air
rtrmination. Slope
hori7.0ntal
piping
downward toward
the boiler at leasr
1/4
inch
ptr
foot.
Set'
page 48
for
gen~aJ
guidelines.
Step 9
t
ns~l~ipt
s upports
t\rery
5
feet on
borh
the
horizonral
and
verttc
runs
.
Step 10 t nsrall
a
hanger
supporr
wirhin
6
inches
of
any
upturn in
the piping.
45