Installing Batteries; Connecting Cabled Stations - Davis Instruments Vantage Pro2 Manual

Hide thumbs Also See for Vantage Pro2:
Table of Contents

Advertisement

Installing Batteries

4. Check to make sure the console runs through a brief self-test procedure successfully.
On power up, the console displays all the LCD segments and beeps twice. A mes-
sage displays in the ticker banner at the bottom of the console, followed by the first
screen that displays during Setup Mode. Press and hold DONE to skip the message
and enter into Setup Mode.
Setup Mode guides you through steps required to configure the station. See "Setup
Mode" on page 9 for more information.
Installing Batteries
1. Remove the battery cover located on the back of the console by pressing down on
the two latches at the top of the cover.
2. Insert three C batteries into the battery channel, negative (or flat) terminal first.
3. Replace the battery cover.

Connecting Cabled Stations

Cabled Vantage Pro2 stations come with 100 feet (30m) of cable. This cable is used for
connecting the console to the ISS. Maximum cable length from ISS to the console
using Davis Instruments cables is 1000 feet. To connect the console to the ISS:
1. Firmly insert the console end of the straight-through four-conductor wire into the
console receptacle marked "ISS" until it clicks into place. Do not force the
connector into the receptacle.
5
To ISS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vantage pro2 plus

Table of Contents