Setting Up - BT Quartet 1100 User Manual

Hide thumbs Also See for Quartet 1100:
Table of Contents

Advertisement

Quartet 1100 User Guide – Edition 4 – 7.8.00

Setting up

Follow these steps to set up your Quarter 1100 ready for use.
Plan the location
Situate your Quartet 1100 close
enough to the mains power socket
and telephone socket so that the
cables will reach.
Make sure it is at least 1 metre away
from other electrical products to
avoid interference.
Do not situate the product in the
bathroom or other humid areas.
Your Quartet 1100 works by sending
and receiving radio signals between
the base unit and the handset.
The strength of the signal depends
on where you site the base unit and
how the aerial is deployed.
The higher the base unit is located,
the better. An upstairs room is ideal.
Your product can be wall mounted,
for more information see page 26.
1
Plug the power supply
unit cord into the back
of the base unit
2
Connect the base unit
power supply unit to a
power socket
The power supply unit must remain
plugged in all the time.
8

Advertisement

Table of Contents
loading

Table of Contents