1000M
Link/ ACT
PoE
2.4 Rear Panel
The 3-pronged power plug is placed at the rear panel of the switch right side shown as below.
2.5 Hardware Installation
Set the switch on a large flat space with a power socket close by. The flat space should be clean,
smooth, level and sturdy. Make sure there is enough clearance around the switch to allow
attachment of cables, power cord and allow air circulation. The last, use twisted pair cable to
connect this switch to your PC then user could start to operate the switch
On
Link 1000Mbps
off
Link 10/100Mbps
On
Flashing
Data activating
Port is linked to Power
On
No Power Device is
Off
Link
Device
connected
5
ES1625-31
2 (17~18)
18 (1~18)
18 (1~18)
16 (1~16)
16 (1~16)