A S S E M BLY ST E P 2
HARDWARE BAG 2 CONTENTS :
A Open HARDWARE BAG 2.
B Slide CONSOLE MAST BOOTS
down over BASE FRAME.
C Lift RUNNING DECK to upright
position.
D Insert 4 SCREWS (E) into inside
holes of CONSOLE MAST BOOTS.
E Connect CONSOLE WIRES.
F Slide CONSOLE BRACKETS into
CONSOLE MAST as shown.
G To attach CONSOLE, insert
1 FLAT WASHER (F), 1 LOCK
WASHER (G) and 1 BOLT (D) into
all 6 holes on upper CONSOLE
MASTS.