ASS E MB LY ST EP
NOTE: There is NO hardware bag for this step.
A) Snap the front and back HANDLEBAR COVERS together onto the UPPER HANDLE BARS.
Note the position of the snap tabs on the covers before snapping into position.
B) Repeat on other side.
12
H-series_E5_Rev.1.2.indd 12-13
UPPER HANDLEBAR
HANDLEBAR COVERS
ASSEMBLY STEP
SPACER (O)
TEFLON WASHER (N)
LOWER LINKARM
A) Open HARDWARE BAG FOR STEP 7.
B) Slide SPACER (O) into LOWER HANDLEBAR.
C) Place TEFLON WASHERS (N) on either side of SPACER (O). While holding TEFLON WASHERS (N) slide LOWER
LINK ARM into bottom end of LOWER HANDLEBAR.
D) Insert BOLT (M) into LOWER HANDLEBAR and secure using NUT (P).
E) Repeat on other side.
HARDWARE BAG FOR STEP CONTENTS :
BOLT (M)
60 mm
Qty: 2
TEFLON WASHER (N)
28.4 mm
Qty: 4
LOWER
LOWER LINK ARM
HANDLEBAR
TEFLON WASHERS
SPACER
LOWER HANDLEBAR
NUT (P)
BOLT (M)
SPACER (O)
44 mm axis
Qty: 2
NUT (P)
INSIDE DIAMETER:
8 mm
Qty: 2
1
6/16/08 2:40:16 PM