Installation Procedure; Classifying Zones And Actuators; Installation; Configuration And Electrical Connection - Honeywell HCE 60 Installation And Operation Manual

Storey controller
Table of Contents

Advertisement

Overview

Installation procedure

Classifying zones and actuators

• Determine which heating circuits* are controlled by the storey
controller.

Installation

• Install Hometronic components.

Configuration and electrical connection

• Set the storey controller to the actuator type, attach cables to the
respective connections and connect components together.

Start-up

• Assign setpoint adjusters and any room temperature sensors to the
temperature zones.
• Assign room names at the Hometronic Manager if necessary.
• Assign the time program of the wireless setpoint adjuster HCU 30
to the temperature zones if necessary.
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents