Table 4-3
Table 4-3 Cabinet cable checklist
No.
1
2
Table 4-4
Issue 02 (2012-09-10)
Item
The power cables and ground cables are
connected safely. The spring washer of
the ground cable terminal is on the flat
washer.
The lugs of the power cables and ground
cables are soldered or crimped tightly.
The power cables and ground cables are
not crossed and are separated from other
cables.
The redundant part of the power cables
and ground cables should be cut. The
cables cannot be circled.
The ground cables must be tightly
connected to the doors of the cabinet.
Labels are filled and attached to power
cables and PGND cables; power cables
and PGND cables including power
distribution switches are labeled correctly
and clearly. Labels are attached 20 mm
from the connector.
The clearance between the power cable,
PGND cable, and signal cable must be
more than 30 mm.
describes the cabinet cable checklist.
Item
Cables are correctly connected.
Cable ties are not overlapped and
connectors are smooth.
describes the signal cable checklist.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Powering on the Device
Method
-
-
-
-
-
-
Method
-
-
52

Advertisement

Table of Contents
loading

Table of Contents