Fujitsu PRIMERGY SX910 S1 Operating Manual page 27

Storage blade
Table of Contents

Advertisement

Installing the dummy module
Slide the dummy module with the release lever down into the empty slot until it
clicks into place.
Installing the storage blade
The PRIMERGY SX910 S1 storage blade can be installed during operation and
is recognized by the management blade. You must restart the related server
blade to enable the storage blade to communicate with the server blade, see the
section
"Putting the Storage Blade into operation" on page
V
CAUTION!
Follow the safety instructions and information in section
sensitive device label" on page
Figure 5: Unlocking and installing the storage blade
I
Make sure the storage blade is installed the correct way round. The
control panel must be in the area at the top.
Ê Undo the locking mechanism (1) of the release lever.
SX910 S1
2
Operating Manual
Installing/removing a Storage Blade
17.
1
3
41.
"Electrostatic
27

Advertisement

Table of Contents
loading

Table of Contents