LOADER INSTALLATION
NOTE: Install sub-frame and weights (Page
13 - 17).
The sub-frame, masts and main frame are
assembled. All cylinders and hoses are
attached to the loader frame and hydraulic
pump.
1. Move the tractor centrally between the
masts.
2. Mount hydraulic pump to tractor by sliding
splined pump drive joint onto front PTO
shaft with mounting brackets inside main
frame and attaching with four 5/16 x 7/8
inch bolts.
3. Attach the front guard on the front of the
sub-frame using two each 1/2 x 1 inch and
1/2 x 1 5/16 inch bolts, and four each 1/2
inch nuts and washers. Tighten bolts and
nuts.
Torque: 76 ft-lb (103 Nm)
LOADER INSTALLATION
37