LOADING
As bucket begins to fill with material, gradually
roll the bucket back and raise the loader to
increase "fill" capacity. This procedure also
results in the material being removed in layers
from the top for maximum loading efficiency.
When the bucket is full, raise loader
the bucket is clear of material and slowly back
out of pile.
For maximum loading efficiency, minimize
angle of turn and distance between the
loading and unloading points.
so that
OPERATING INSTRUCTIONS
29