7. Attach brace arms to masts with clevis
pins and clip pin.
Tighten front guard bolts installed in step 5.
Torque: 76 ft-lb (1 03 Nm).
8. Bring the two hoses along the left side
brace arm to the left mast. Route hoses
on the left brace arm with metal loops.
Ensure that the high pressure hose
(smaller diameter) is positioned on top of
the suction hose (large diameter).
Install the nylon tie strap to bind the two
hoses together at front corner of hoodline.
9. Install valve handles to the hydraulic
control valve mounted on the left mast.
The "A" handle attaches to the spool used
for loader operation and the "B" handle
attaches to the spool for bucket operation.
FRONT LOADER ASSEMBLY
COTTER PIN
PIN
21