FIGURE 2
5
2
3/8 X 1-3/4" 9
STEP 2:
• Screw the long threaded end of the new WEIGHT STACK CABLE (3) into the end of the WEIGHT PLATE SHAFT. See
FIGURE 2.
• Route the WEIGHT STACK CABLE (3) around the pulley in the BOOM PLATES as shown in FIGURE 2. (NOTE: Make sure
the cable runs in the grooves of the pulleys.)
• Assemble one 3-1/2" PULLEY (5) to the PULLEY BRACKET (2) using one 3/8 X 1-3/4" BOLT (9) and one 3/8" LOCK NUT
(8) (Note: Loop the WEIGHT STACK CABLE around the PULLEY prior to assembling the PULLEY BRACKET.)
• Screw the short threaded end of the WEIGHT STACK CABLE (3) into the end of the PULLEY BRACKET (2). See FIGURE 2.
1/2
0
8
3
1/2
1
2
1/2
1/2
3
5
1/2
4
5
1/2
6