4.4.3.2
Output voltage 120Vac split-phase
1.
The factory setting of the output tap (208Vac) has to be changed to 240Vac. Please refer to fig. 12 and 12a.
Proceed as follows:
1.1 Remove the yellow wire L from faston 67 (connect) and place this wire on faston 65 (park).
1.2 Remove the brown wire F from faston 66 (park) and place this wire on faston 67 (connect).
Output tap factory setting: 208 Volt
T1
F
32V
L
88V
64
62
120V
63
Output tap changed to 240 Volt
T1
F
32V
L
88V
64
62
120V
63
Figure 12. LanPro 5/6/8/10-11U:
Output tap change
2.
Connect the load wires between the terminals 1 (L1) and 2 (N) (120V), and between the terminals 3 (N) and 4
(L2) (120V). Connect the ground wire to terminal 5. Ground connection is essential! Do not remove the link
between terminals 2 and 3. See figure 13.
gnd
N
4
5
1
2
3
120V
120V
®
Figure 13. LanPro
120 Vac split-phase output connection
3.
Return to either 4.4.1.1 step 5 or 4.4.1.2 step 5
LX: OPM_LPA_11U_5K0_10K_1US_V021
PCB1113-C
(park) 65
(park) 66
(connect) 67
1113-D
O
PCB1113-C
(park) 65
(park) 66
(connect) 67
1113-D
O
gnd
L1
L2
6
7
8
5/6/8/10-11U:
14
GE Digital Energy
61
65
72
66
74
67
73
Figure 12a. LanPro 5/6/8/10-11U:
Rear view
GE DE LanPro-11U UPS: Installation / User Manual 2.1 (US)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents