Plumbing Requirements; Plumbing Hook-Up - Bunn Single GPR DBC-DV Installation & Operating Manual

With smart funnel dual voltage model
Hide thumbs Also See for Single GPR DBC-DV:
Table of Contents

Advertisement

This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a
" or larger supply line. A shut-off valve should be installed in the line before the brewer.
1
2
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa).
The water inlet fitting is
NOTE: Bunn-O-Matic recommends
feet from the
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
1
2
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow
prevention to comply with federal, state and local codes. For models installed outside the U.S.A., you
must comply with the applicable Plumbing /Sanitation Code for your area.

PLUMBING HOOK-UP

1. Flush the water supply line and securely attach it to the flare fitting or adapter located on rear of brewer.
2. Turn on the water supply.

PLUMBING REQUIREMENTS

" flare.
3
8
" copper tubing for installations of less than 25 feet and
1
4
Page 5
" for more than 25
3
8
37994.1 031512

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents