Electrical Requirements - Bunn Single GPR DBC-DV Installation & Operating Manual

With smart funnel dual voltage model
Hide thumbs Also See for Single GPR DBC-DV:
Table of Contents

Advertisement

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L2 RED
WHITE
WHITE
NEUTRAL
NEUTRAL
L1 BLACK
L1 BLACK
GREEN
120 volt ac models
Note: This electrical service consists
of 2 current carrying conductors (L1
and Neutral) and a separate conduc-
tor for earth ground.
ELECTRICAL HOOK-UP
CAUTION: Improper electrical installation will damage electronic components.
1.
An electrician must provide electrical service.
2.
Determine the available on-site electrical service.
3.
Select the desired unit voltage based on the available on-site electrical service.
4.
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
5.
Remove the back access panel to gain access to the terminal block.
6.
Feed the supply leads through the strain relief at the rear of the brewer.
7.
Using the above diagrams, connect the desired electrical service to the field wiring terminal block.
8.
If wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the Power
Supply Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4 Con-
ductor, Rated 90° C. Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Configuration,
Rated 125/250V, 20 AMPS. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long
(measured from Strain Relief to end of the Attachment Plug Cap).
9.
Connect the brewer to the power source and verify the voltage at the terminal block.
10. Set toggle switch on component bracket to the appropriate position and replace the access panel.
11. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If
plumbing has been hooked up, the brewer is ready for Initial Set-Up.

ELECTRICAL REQUIREMENTS

L2 RED
L2
WHITE
N
NEUTRAL
L1 BLACK
L1
GREEN
GREEN
G
P4337
120/208 & 120/240 volt ac models
Note: This electrical service consists
of 3 current carrying conductors
(Neutral, L1 and L2) and a separate
conductor for earth ground.
L2 RED
L2
WHITE
N
NEUTRAL
L1 BLACK
L1
GREEN
G
Page 4
BACK
WHITE
BLUE
WHITE/VIOLET
FRONT
120/208V
120/240V
120V
P2853
DUAL VOLT
TOGGLE SWITCH
37994.1 080813

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents