Installing Adaptor And Termination Cap - Heat & Glo Grand-XTS Installation Manual

Installation and operation
Table of Contents

Advertisement

D. Installing Adaptor and Termination Cap
For installation of termination cap see minimum vent
heights for various pitched roofs (see Figure 7.2) .
To install adaptor see Figure 7.3.
2 FT.
20 INCHES MIN.
MIN.
DISCHARGE
OPENING
GAS DIRECT VENT
TERMINATION CAP
Roof Pitch
H (Min.) Ft.
Flat to 6/12....................1.0*
Over 6/12 to 7/12 ........1.25*
Over 7/12 to 8/12 ..........1.5*
Over 8/12 to 9/12 ..........2.0*
Over 9/12 to 10/12 ........2.5*
Over 10/12 to 11/12 ..... 3.25
* 3 foot minimum in snow regions
Figure 7.2 Minimum Height from Roof to Lowest Discharge
Opening
To help eliminate cold air drafts, it may be necessary to place non-
combustible insulation around the fl ues as they go though the damper.
Masonry
LINK-DV30B
Installation
EXHAUST
AIR
VENT PIPE
Figure 7.4
HORIZONTAL
OVERHANG
VERTICAL
WALL
LOWEST
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
H (Min.) Ft.
Over 11/12 to 12/12 ....... 4.0
Over 12/12 to 14/12 ....... 5.0
Over 14/12 to 16/12 ....... 6.0
Over 16/12 to 18/12 ....... 7.0
Over 18/12 to 20/12 ....... 7.5
Over 20/12 to 21/12 ....... 8.0
LINK-DV4-30B
TERMINATION
CAP
OR
INLET AIR
VENT PIPE
Heat & Glo • Supreme-XTS, Grand-XTS • 349-901 Rev. G • 9/08
Sharp Edges
• Wear protective gloves and safety
Damper Flashing Kit (Optional)
For use with LINK-DV4-30B Liner Kit.
Note: Damper may have to be removed to use this kit.
• Run fl ex liners through 3" holes in damper fl ashing.
• Attach damper fl ashing to fi rebox roof with self tapping
screws included in kit.
CLASS A PIPE
Figure 7.3
Installation
WARNING:
DO NOT BLOCK
THIS PIPE END!
Note: Untwist
the pipe while
extending it, to
achieve full 30'
length.
CAUTION
glasses during installation.
Note: The LINK-DV4-30B
system REQUIRES this insulation.
Factory Built
Wood Burning
OPTIONAL LINK-ZC-ADPB
FOR USE WITH CLASS A
WOODBURNING PIPE
Remove 18 inch x 18 inch fl ashing on cap by removing
3 screws. Connect both the LINK-ZC-ADPB to Class
A Pipe and the termination cap to the LINK-ZC-ADPB
with the self tapping screws provided.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Supreme-xts

Table of Contents