The control panel

1 Programme guide
This will help you to select the correct programme
for drying.
2 Quick drying button
By depressing this button the drying time is reduced
in the following COTTON programmes:
• extra dry
• ready to wear
• store dry
The corresponding light illuminates. This option
cannot be selected together with "low temperature"
function
.
3 Buzzer OFF button
A buzzer sounds
• when selecting the programme
• when depressing the buttons
• when an incorrect option selection is made
• when the programme selector dial is turned to
another position during the programme or when
you depress an option button during the cycle
• during the anti-creasing phase
• at the end of the programme
• when the water reservoir is full
• if the machine is not working correctly
• when the door of the appliance or the small door at
the bottom are open
By depressing button
the acoustic signal is
switched off in the following cases:
• when selecting the programme
• when depressing the buttons
• when the programme selector dial is turned to
another position during the programme or when
you depress an option button during the cycle
• during the anti-creasing phase
• at the end of the programme.
The corresponding light comes on.
4 Low temperature button
Pressing this button allows drying to be performed
at a lower temperature, for delicate items.
The corresponding pilot light comes on.
This option can also be used for time controlled
drying.
This function cannot be used with QUICK DRYING.
5 DELAYED START button
This button allows you to delay the starting of the
programme by 3, 6 or 9 hours.
Press the button until the light relevant to the
desired delay lights up.
This option must be selected after having selected
the programme and before pressing START/PAUSE
to start the programme.
The machine begins the countdown, which is shown
by the pilot lights. For example, if you have chosen a
9-hour delay (pilot light 9h lit), after 3 hours, 9h goes
out and 6h lights up; after 3 more hours, 6h goes out
and 3h lights up. When the 9 hours are over (pilot
light 3h off), the drying cycle begins.
During the delayed start period, it is not possible to
change the programme or the selected delay. If you
wish to do so, you must first cancel everything by
rotating the programme selector dial to position "0".
Select the new programme, the options and the
delayed start, then press START/PAUSE.
If you wish to change only the options, this can be
done on condition that the new option(s) is(are)
compatible with the programme. Set the machine to
PAUSE by depressing the relevant button, select the
new option(s) and depress START/PAUSE button
again.
If you wish to add some laundry while the machine
is performing the countdown, after having done so
and having closed the door, press START/PAUSE
again, in order to allow the machine to complete the
remaining countdown time.