Technical Data

Gas Burners Rating
Rapid Burner
3,0 kW (G20) - 2,8 kW (G30/G31)
Semirapid Burner
Auxiliary Burner
Appliance Class
Category
Setting
ZGL 66:
ZXL 66:
Gas connection

Instruction for the Installer

The following instructions about installation and
maintenance must be carried out by qualified
personnel in compliance with the regulation in
force.
The side walls of the unit in which the hob is
going to be installed, must not exceed the height
of the working top.
Avoid installing the appliance in the proximity of
inflammable materials (e.g. curtains, tea towels
etc.).
The appliance must be electrically disconnected
before all interventions. If any electric supply to
the appliance is required to carry out the work,
ensure all the necessary precautions are followed.
THE MANUFACTURER WILL NOT ACCEPT
LIABILITY, SHOULD ANY OF THE OTHER SAFETY
INSTRUCTIONS INCORPORATED IN THIS BOOK
OR THE REGULATION IN FORCE BE IGNORED.
FO 0264
2,0 kW
1,0 kW
II 2H3+
Natural gas G 20 / 20 mbar
LPG G30/G31 28-30/37 mbar
A) Ramp with ending nut
B) Seal
C) Adjustable connection
Fig. 4
Electric hotplate
Ø 145 mm.
Electric Supply
3
230 V 50 Hz
Hob recess dimensions
Length
Width
G 1/2"
Gas connection
Choose fixed connections or use a flexible pipe in
stainless steel in compliance with the regulation in force.
If using flexible metallic pipes, be careful they do not
come in contact with mobile parts or they are not
squeezed. Use the same attention when the hob is
combinated with an oven.
IMPORTANT - To ensure a correct operation, a saving
of energy and the long-life of the appliance, the voltage
pressure of the appliance must correspond to the
recommended values.
The adjustable connection is fixed to the comprehensive
ramp by means of a threaded nut G 1/2". Interpose the
sealing between the components as shown in Fig. 4.
Screw the parts without forcing, adjust the connection in
the required direction and tighten everything.
IMPORTANT - When the final connection has
been made, it is essential that a thorough leak
test is carried out on the hob and installation.
Use some soapy water, never a flame.
1,5 kW
550 mm.
470 mm.
7