LARGE bATTERY bANK

SITUATION
SOLUTION
One alternator feeding a
The D250S DUAL recharges
Starter battery and a large
the Starter battery quickly
Service battery bank.
to 100%, which guarantees
trouble-free engine starts. The
PRObLEm
Starter battery will be pulse
The Starter battery will not be
maintained directly from the
fully charged and might not

Solar panel.

always be able to start the
engine.
INSTALLATION SHEET 3
+IN
+IN
8
TIP 3
Mount the temperature sensor
on the Starter battery.
WARNING!
- Max 22V input
12V
D250S DUAL
+OUT
SOLAR PANEL
SITUATION
SOLUTION
One alternator and a Solar
The D250S DUAL charges
panel feeding a Starter battery
the Service battery quickly
and a small Service battery.
and very efficiently from
both the Alternator and the
PRObLEm
Solar panel. The Solar panel
The Service battery will take
produces at its maximum
a very long time to recharge
power point when the engine
due to low alternator voltage.
is off. When both the Solar
The Solar panel is difficult
panel and the Alternator are
to synchronize with the
on, the Solar panel adjusts
alternator. Due to these issues,
to the Alternator. The battery
the battery will underperform
will be fully charged, produce
and die prematurely.
more and last significantly
longer.
INSTALLATION SHEET 4
+IN
+IN
TIP 4
See Tip 1 and Tip 2.
WARNING!
•Max 22V input
•Do not connect two solar
panels in series
12V
D250S DUAL
+OUT

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the D250S Dual and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

SmartpassFully automatic

Table of Contents

Save PDF