Download Print this page

Dunkirk XEB-3 Installation, Operation & Maintenance Manual page 16

Xeb series gas-fired hot water induced draft boilers

Advertisement

INDUCED
DRAFT HIGH EFFICIENCY
BOILERS
Maximum Horizontal Vent Length For StainlessSteel VentPipe - 30'
Plus One 90° Elbow PlusVent Terminal.
Minimum Horizontal Vent Length - 2' Plus One 90° ElbowVent
Termination.
Additional elbowsare equivalent to 6 feet of straight pipe for 4" di-
ameter 90° elbowor 3 feet of straight pipe for 3" diameter 90° elbow.
2, 3, 4, 5, Section Boilers use 3"vent pipe; for 6, 7 SectionBoilers use
4"vent pipe.
CHOICE OF VENT PIPE MATERIAL
1. U.L. ListedZ-FlexZ-Vent Stainless SteelVent Pipe.
2. U.L.Listed Heat-Fab Saf-T-Vent Stainless SteelVent Pipe.
3. U.L. ListedFlex-LStar-34StainlessSteelVent Pipe.
4.
U.L. ListedProTechSystemsFasNSeal S tainlessSteelVent Pipe.
Figure 10 - Induced Draft High Efficiency boilers
Optional
Termination
Fitting
T Jemlund
S_de Wall Vent Hood
VHolo3"for
2, 3, 4& 5 Section
Boilers
VH-I_4" for 6 & 7 Section
_i|ers
Termination Fitting
_° Elbow, pointing down, same matetiai
and
pipe size as venting systems equtped
with
screen (Min, I/4" Mesh) to keep birds outs
Fot a combustib|e
wa|l, use a thimb|e_ Select as
fo|iows:
Vent Pipe: Z-Vent, SafoT_Vent, Star 34
_tmble:
Simpson
Duravent
Thimb|e --
# 3G_¢_,/T(3% # 4GV_t#T (4")
Vent Pt_: FasNSeal
Thimble: FasNSea| Wal| Thimble
#FSWT03-3'; FSWT04-4 _'
PRchDown Toward
Outside 1i4" Per Foot
Pitch Down Towa_
Outside
1/4" Per Foot
_vel

Advertisement

loading

This manual is also suitable for:

Xeb-5Xeb-4Xeb-7Xeb-2Xeb-6