Display wall installations should be planned and implemented keeping in mind
the technical requirements for the heat control of the Cells. Ensure that Cells
located in one ventilation space have sufficient intake of cold air (
MT550: 220 m3 / hour / Cell
The following example of a 4x3 display wall of MT550 Cells provides general
guidelines for the design process.
).