Draft Inducer
The draft inducer (blower) provides a means for pulling combustion
air into and through the mixer, the burner, the flue ways of the
cast aluminum boiler sections and the flue adapter before being
discharged through the vent piping to the outdoors. See applicable
sections for proper sizing and installation of combustion air and vent
piping in this manual.
Circulator Pump
Every forced hot water systernrequires at least one circulating purnp.
The circulating pump imparts the necessary energy to move the
water through the closed loop supply and return piping systems,
terminal heating equipment (i.e.finned tube radiators, etc.) and back
through the boiler for reheating. Toprovide the required hot water
flowrates, the circulator pump must be properly sized to overcome
frictional losses (usuallymeasured in feet of water, also referred to
as "pump head loss") of the supply and return piping systems and
boiler. The circulator pump is furnished in a carton within the boiler
cabinet for a single zone or zone valve controlled heating systernand
should be correctly located on the downstream (i.e.,pumping away)
side of the expansion tank. For a pump controlled system (where
there is a circulator for each zone) the circulator provided with
the boiler can work for one zone. For more details on piping and
circulators, see Near Boiler Pipingsection (page 12of this manual).
Drain Valve
The manual drain valve provides a means of draining the water in
the heating system, including the boiler and hot water supply and
return piping systems installed above the drain valve. This drain
valve is installed in the 3_,,tapping at the bottom of the front boiler
section. Any piping installed below the elevation of this drain valve
will require additional drain valves to be installed at low points in
the piping systerns in order to drain the entire systern.
Blocked Vent Safety Shutoff
This boiler is equipped with a blocked vent safety shutoff rneans,
which shuts offrnain burner gas in the event that the flow of
combustion products through the flueways is reduced. In the event
of blocked flueways, enough air will not be available to support
combustion, and the $9301 Integrated Boiler Control (IBC) will
loci<out due to loss of adequate air flow (after 3 trials for ignition).
The "PURGE" diagnostic indicator larnp (larnp "B" on the IBC,
see Figure 16) will blink indicating the failure rnode as a lack of
adequate air flow. The IBC is rnanually reset frorn loci<out by either
removing and re-establishing the thermostat's call for heat, or by
turning the service switch OFF, then back ON. If the boiler cannot
be restored to normal operating condition by resetting the control,
contact a qualified service agency to check heat exchanger flueways
for blockage.
External Condensate
Pump (Optional)
For installations where there is no floor drain or other appropriate
drainage receptacle available to receive condensate frorn the boiler,
an external float activated condensate purnp with integral sump is
required. This unit can be installed to purnp the condensate to a
remote tie in point to a sanitary sewer system. For this application,
the boiler rnust be installed so that proper pitch of piping to
the external condensate reservoir (surnp) can be accornplished.
Use wood frarne or blocks to raise boiler as required for proper
installation.
A.S.M.E. Rated Pressure Relief Valve
Each boiler rnust have a properly sized and installed American
Society of Mechanical Engineers rated pressure relief valve. Water
expands as it is heated by the burner/boiler sections. If there is no
place for the water to expand its volurne, (i.e. a properly sized and
properly functioning expansion tank) pressure on the inside of the
boiler and heating systern will increase. The furnished relief valve
will automatically open at 30 psig pressure to relieve the strain on
the boiler and heating system frorn the increasing pressure. The
pressure relief valve discharge rnust be piped with piping sarne size
as the valve discharge opening to an open drain, tub or sink, or other
suitable drainage point not subject to freezing, in accordance with
A.S.M.E. specifications. Failure to provide the pressure relief valve
with piping as herein described may cause water darnage and/or
serious bodily injury. The boiler rnanufacturer is not responsible for
any water damage or personal injury.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

90-7590-100Quantum 90

Table of Contents