Troubleshooting Chart - Dunkirk 90-50 Installation, Operation & Maintenance Manual

Gas-fired, directvent, condensing, hot water boiler
Table of Contents

Advertisement

TROUBLESHOOTING CHART 2
NO
Y
CHART 1
CHECK THAT CIRCUIT BREAKER
IS ON OR
FUSES ARE OK AT THE ELECTRICAL
PANEL
,OK
CHECK THAT SERVICE SWITCH
IS ON
,OK
CHECK CASTING TEMPERATURE
SAFETY
SWITCH.
PUSH RESET BUTTON ON SWITCH.
CONTACTS
OPEN (BUTTON
UP) OR CLOSED
(BUTTON
DOWN)?
CLOSED
CHECK WIRING TO IBC. !20 VAC BETWEEN
TERMINAL
1 AND 3 AT WIRING HARNESS
PLUG CN7?
YES
120 VAC BETWEEN
TERMINALS
1 AND 3 AT
CONNECTOR
CN3 ON IBC?
YES
120 VAC AT TRANSFORMER
PRIMARY
TERMINALS?
YES
24 VAC AT TRANSFORMER
SECONDARY
TERMINALS?
YES
24 VAC AT WIRING
HARNESS PLUG CN2?
YES
REPLACE
IBC
( NO
)
CHART 1
.I
CHECK FOR 120 VAC BETWEEN
TERMINALS
1 AND 3 AT CONNECTOR
CN5 ON IBC?
YES
CHECK FOR 120 VAC AT CIRCULATOR
YES
REPAIR/REPLACE
CIRCULATOR
I
I
I
I
J
I
I
1
OPEN
NO
NO
NO
NO
NO
NO
NO
CHECK WATER LEVEL IN BOILER. CHECK
FOR AIR TRAPPED
IN TOP OF BOILER.
CONTACTS
WILL NOT STAY CLOSED
UNTIL
BOILER COOLS OFF.
REPLACE/REPAIR
WIRING
FROM SERVICE
SWITCH TO IBC
REPLACE
IBC
REPAIR WIRING TO TRANSFORMER
REPLACE TRANSFORMER
PUSH RESET BUTTON
ON CASTING
TEMP.
SAFETY SWITCH.
CHECK CONTINUITY
OF CASTING TEMP.
SAFETY
SWITCH CONTACTS.
CONTACTS
OPEN OR CLOSED?
l
CLOSED
REPLACE/REPAIR
WIRING
FROM
TRANSFORMER
TO IBC
OPEN
REPLACE CAST. TEMP.
SAFETY SWITCH.
REPLACE
IBC
REPLACE/REPAIR
WIRING
FROM
IBC TO CIRCULATOR

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

90-7590-100Quantum 90

Table of Contents