Checking The Gas Piping
The boiler and its gas connection must be leak tested before placing
the boiler in operation. Open the manual shutoff valve. Test for leaks
by applying soap suds (or a liquid detergent) to each joint. Bubbles
forming indicate leak. CORRECT EVEN THE SMALLEST LEAK
AT ONCE.
Never use a match
or open flame to test for
leaks.
20
40
60
92,000
190,000
350,000
625,000
63,000
130,000
245,000
445,000
50,000
105,000
195,000
365,000
818"
3/4"
1/2"
3/4"
20
131,000
216,000
189,000
393,000
40
90,000
145,000
129,000
267,000
60
72,000
121,000
103,000
217,000
* Outside diameter
Figure 12 - Gas Piping
_///S
GAS SUPPLY
PIPING
MANUAL
SHUT=OFF
VALVE
SEDIMENT
TRAP
GROUND JOINT
UNION