Power Connection Procedures - Asus KN97 User Manual

Pentium ii motherboard
Hide thumbs Also See for KN97:
Table of Contents

Advertisement

III. INSTALLATION

Power Connection Procedures

1. After all jumpers and connections are made, close the system case cover.
2. Make sure that all switches are off (in some systems, marked with
3. Connect the power supply cord into the power supply located on the back of
your system case as instructed by your system user's manual.
4. Connect the power cord into a power outlet that is equipped by a surge protector.
5. You may then turn on your devices in the following order:
a. Your monitor
b. External SCSI devices (starting with the last device on the chain)
c. Your system power.
6. The power LED on the front panel of the system case will light. The monitor
LED may light up after the system's if it complies with "Green" standards or if
it has a power standby feature. The system will then run power-on tests. While
the tests are running, additional messages will appear on the screen. If you do
not see anything within 30 seconds from the time you turn on the power, the
system may have failed a power-on test. Recheck your jumper settings and
connections or call your retailer for assistance.
7. During power-on, hold down <Delete> to enter BIOS setup. Follow the next
section "BIOS SOFTWARE" for instructions.
* Powering Off your computer: You must first quit or shut down your operat-
ing system before switching off the power switch.
ASUS KN97 User's Manual
).
33

Advertisement

Table of Contents
loading

Table of Contents