Installation Of The Pvi-Slp Power Vent; Secure The Vent Sections; Disassemble Vent Sections - Heat & Glo SOLARIS36-ST Owner's Manual

Table of Contents

Advertisement

D. Installation of the PVI-SLP Power Vent
• Follow the instructions in Section 8.C for proper
installation.
E. Secure the Vent Sections
• Vertical runs of SLP pipe must be supported every 8 ft.
(2.44 m).
• Horizontal sections must be supported every 5 feet
(1.52 m).
• Vertical runs of DVRP pipe must be supported every 6
feet.
• Horizontal runs of DVRP pipe must be supported every
4 feet.
• Vent supports or plumbers strap (spaced 120º apart)
may be used to support vent sections. See Figures 10.8
and 10.9.
• Wall shield fi restops may be used to provide horizontal
support to vent sections.
• SLP ceiling fi restops have tabs that may be used to
provide vertical support.
• DVRP ceiling fi restops have tabs that may be used to
provide vertical support.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate.
Use vent run supports and connect vent sections per in-
stallation instructions. DO NOT allow vent to sag below
connection point to appliance.
Figure 10.8 Securing Vertical Pipe Sections
Figure 10.9 Securing Horizontal Pipe Sections
42
120º
120º
Heat & Glo • Solaris • 2179-900 Rev. E • 4/11
F. Disassemble Vent Sections
• Rotate either section (see Figure 10.10) so the seams
on both pipe sections are aligned as shown in Figure
10.11.
• Pull carefully to separate the pieces of pipe.
Figure 10.10 Rotate Seams for Disassembly
Figure 10.11 Align and Disassemble Vent Sections

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solaris36-mr

Table of Contents