Skoda Octavia Owner's Manual page 191

Hide thumbs Also See for Octavia:
Table of Contents

Advertisement

Preparing to use the breakdown kit
ä
First read and observe the introductory information and safety warn-
ings
on page 188.
The following preparatory work must be carried out before using the breakdown
kit.
In the event of a puncture, park the vehicle as far away as possible from the
flow of traffic. Park on as flat and firm a surface as possible.
Let all of the occupants get out. While changing a tyre, the occupants of the
vehicle should not stand on the road (instead they should remain behind a crash
barrier).
Switch off the engine and move the gearshift lever into Neutral or move the
selector lever for the automatic gearbox into position P.
Firmly apply the handbrake.
Check whether you can carry out the repairs with the breakdown
kit
» page
188.
If a trailer is connected, remove it.
Remove the breakdown kit from the luggage compartment.
Stick the sticker
» Fig. 155
on the dash panel in view of the driver.
2
Do not remove the foreign body, e.g. screw or nail, from the tyre.
Unscrew the valve cap.
Use the valve remover
to unscrew the valve core and place it on a clean sur-
1
face (rag, paper, etc.).
Seal and inflate tyres
ä
First read and observe the introductory information and safety warn-
ings
on page 188.
Sealing tyres
Forcefully shake the tyre inflator bottle
Firmly screw the inflation hose
3
direction. The film on the cap is pierced automatically.
Remove the plug from the inflation hose
the tyre valve.
Hold the bottle
with the bottom facing upwards and fill all of the sealing
10
agent from the tyre inflator bottle into the tyre.
Remove the empty tyre inflator bottle from the valve.
Screw the valve core back into the tyre valve using the valve remover
190
Do-it-yourself
» Fig. 155
several times.
10
onto the tyre inflator bottle
in a clockwise
10
and plug the open end fully onto
3
Pumping up the tyres
Screw the tyre inflation hose
tyre valve.
Check whether the air release valve
Start the engine and run it in idle.
Plug the connector
Switch on the air compressor with the ON and OFF switch
Allow the air compressor to run until a pressure of 2.0 - 2.5 bar is achieved.
Maximum run time of 8 minutes
Switch off the air compressor.
If you cannot reach an air pressure of 2.0 – 2.5 bar, unscrew the tyre inflation
hose
from the tyre valve.
5
Drive the vehicle 10 metres forwards or backwards to allow the sealing agent to
"distribute" in the tyre.
Firmly screw the tyre inflation hose
inflation process.
If you cannot reach the required tyre inflation pressure here either, this means
the tyre has sustained too much damage. You cannot seal with tyre with the
breakdown kit
»
Switch off the air compressor.
Remove the tyre inflation hose
Once a tyre inflation pressure of 2.0 – 2.5 bar is achieved, continue the journey at
a maximum speed of 80 km/h (50 mph).
Check the tyre inflation pressure after driving for 10 minutes
WARNING
During inflation, the tyre inflation hose and air compressor may get hot- risk
of injury!
Do not place the hot tyre inflation hose or hot air compressor on flammable
materials - risk of fire!
If you cannot inflate the tyre to at least 2.0 bar, this means the damage sus-
tained was too serious. The sealing agent cannot be used to seal the tyre. Do
not drive the vehicle. Get professional assistance!
CAUTION
Switch off the air compressor after running 8 minutes at the latest - danger of
overheating! Allow the air compressor to cool a few minutes before switching it
on again.
.
1
» Fig. 155
of the air compressor firmly onto the
5
is closed.
7
9
into 12 Volt socket
» page
75.
»
!
back onto the tyre valve and repeat the
5
.
from the tyre valve.
5
.
8
» page
191.

Advertisement

Table of Contents
loading

Table of Contents