System Commissioning - Powering Up
System Commissioning - Powering Up

Powering Up the System

Once installation is complete, and, if applicable, the connections to beams and/or an
external receiver has been made, the system can be powered up by connecting the
batteries first (linking the terminal as shown below) and then by plugging in the mains
lead into an outlet and turning it on.
Powering Up
1. Connect the batteries by connecting the loose terminal, to the battery as shown
2. Plug the mains lead into a wall outlet and turn it on.
1
MAIN
FUSE
(F2)
POWER GOOD
LED
When power is applied, the system will give two high frequency beeps, signalling
that the system has powered up. The system signals various conditions using
audio-visual indications. The POWER GOOD LED lights when power is present.
high frequency beep, generally indicating confirmation or a change in status.
low frequency beep, generally indicating error conditions or trouble.
2
On the drawing opposite, note the location of
the main fuse F2. This is the first point to check
when troubleshooting. Also see Page 32 for a