Selector Switch (Half Batch) - Bunn SRU Operating & Service Manual

Coffee brewer
Table of Contents

Advertisement

SERVICE (cont.)
SELECTOR SWITCH (HALF BATCH OPTION)
ALL MODELS EXCEPT 230V CE MODELS
230V CE MODELS
FIG. 18 SELECTOR SWITCH (HALF BATCH)
Location:
The selector switch is located in the center of the
front access panel at the base of the urn on all models
except the 230V CE Models. The selector switch is
located to the right of the front panel, above the start
switch on the 230V CE Models.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the wires from the switch terminals.
3. Check for continuity across the switch terminals
with the switch in the "CLOSED" (bottom - half)
position. Continuity must not be present when the
switch is in the "OPEN" (top - full) position.
If continuity is present as described, the switch is
operating properly.
If continuity is not present as described, replace the
switch.
Removal and Replacement:
1. Remove the wires from the switch terminals.
2. Compress the clips on the back side of the switch
mounting panel and gently push them through the
opening.
3. Push the new switch into the opening and spread
the clips to hold switch in the mounting panel.
4. Refer to Fig. 19 and reconnect the wires.
P2053.25
GRY to Brew Timer
PNK to Brew Timer
ALL MODELS EXCEPT 230V - CE MODELS
GRY to Brew Timer
PNK to Brew Timer
P2117.25
FIG.19 SELECTOR SWITCH TERMINALS
Page 25
230V - CE MODELS
P2118.60
10067 040100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srua

Table of Contents