Installation; Pressure Relief Procedure - Graco Series A Instructions-Parts List Manual

Pressure roller with 20” heavy duty extension, evenflow roller frame and contractor inline valve
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

Assemble pressure roller as shown in Parts Drawing,
page 7. Attach pressure roller assembly to inline
valve.

Pressure Relief Procedure

WARNING
To help prevent injection injuries,
follow this procedure whenever
you stop painting.
psi/MPa/bar
1. Put inline valve trigger safety in SAFETY ON
position (Fig. 1).
2. Shut off power to pump.

Installation

D When connecting EvenFlow roller frame to the
Contractort Inline Valve, use a wrench to tighten.
3. Turn prime/spray valve to PRIME position to
relieve pressure in system.
4. Put inline valve trigger safety in SAFETY OFF
position, and trigger inline valve to relieve any
pressure in hose.
5. Put inline valve trigger safety in SAFETY ON
position, and keep pump prime/spray valve in
PRIME position until you paint again.
309445
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

245397309445

Table of Contents