NOTE
If further battery packs are used, they connect via the previous battery pack. Thus,
the cable provided is attached via the nearest socket connection on the existing
battery cabinet (fig. 3.3.6.e).
8/10 kVA
fig. 3.3.6.e
NOTE
When the UPS is connected to the mains, and the battery pack is connected to the
UPS, the batteries start charging. For best results, allow the UPS to recharge the
batteries during a period of approx. 8 hours. It is acceptable to use the UPS without
first charging the battery, but the runtime may be reduced.
modifications reserved