Tools You Will Need; Tools & Materials Required; Preparing The Opening; Minimum Clearances - GE Monogram ZEU30R Installation Instructions Manual

30" electric radiant cooktop
Hide thumbs Also See for Monogram ZEU30R:
Table of Contents

Advertisement

Tools &
Materials Needed
Materials
Required
Junction Box
Minimum
The following MINIMUM clearance
dimensions must be maintained.
Clearances
Overall
Cooktop
Dimensions
3 1/4"
4
Wire Nuts
29 3/4"
21 7/16"
C L C L
20 7/8"
28"
19 1/4"

Preparing the Opening

Electronic Radiant Cooktop

Tools You Will Need

1/8" Drill Bit &
Electric or Hand
Drill
Ruler or
Straightedge
13" MAX. Depth
of unprotected
overhead cabinets
3 1/4"
20 7/8"
CURVED GLASS
Phillips Head
Screwdriver
Saber Saw
30" MIN.
clearance from
countertop to
unprotected
overhead surface
2" MIN.
clearance from
cutout to side
wall on the left
of the unit
Pencil
1 1/2" MIN.
clearance from
cutout to side
wall on the right
of the unit
18" MIN.
height from
countertop to
nearest cabinet on
either side of unit
6 1/4"
5 1/2"

Advertisement

Table of Contents
loading

Table of Contents