Getting Things Ready; Preparing Cabinet For Fitting Oven - Zanussi ZHG863 Instruction Booklet

Built-in gas double oven and grill
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
This appliance must not be installed on a
wooden base.
The dimensions given provide adequate air
circulation around the unit within the cabinet,
ensuring compliance with BS EN60-335.
Enquiries regarding the installation of the
cooker point if required should be made to
your Regional Electricity Company to ensure
compliance with their regulations.

GETTING THINGS READY

PREPARING CABINET FOR FITTING OVEN

Make sure the cabinet is the correct size for
the appliance to be fitted (Ref. Fig. 4).
If the size is between 605-610*mm, then the
cabinet should be modified so that at the
screw
fixing
points
dimension
of
at
maintained. The modification should ideally
be localised to ensure that after screw fitment
the oven is securely fixed into position.
The adjacent cabinets must be stable and
firmly secured to the wall or floor. If
necessary, make arrangements to ensure the
work surface below which the oven will rest is
level.
Mark the centre of the aperture into which the
appliance is to be fitted onto the plinth board.
Remove the plinth board from in front of the
cabinets.
Cut the required ventilation slot in the plinth
as detailed in Fig.5.
Drill two pilot screw holes into the sides of the
adjacent cabinets, in the positions indicated
by Fig. 4.
Fit the appliance mounting brackets using the
two holes indicated in Fig. 6 to the adjacent
cabinets ( Ref. Fig.4 & 7 )
Check that the mounting brackets are level.
They can be adjusted if necessary by using
the extra holes at the ends of the brackets.
Once the brackets are level, drill a pilot hole
through the central hole in the bracket and fit
the remaining screw.
42
the
recommended
least
600-605mm
Fig.4
is
Fig.5
Fig.6
Fig.7

Advertisement

Table of Contents
loading

Table of Contents