Fixing Jig; Domestic Hot Water System Design - Saunier Duval THEMA F 23 E Installation And Servicing Instructions

Wall mounted modulating boiler
Table of Contents

Advertisement

FIXING JIG

THEMA F 23 E
From left to right, the fixing jig comprises:
A
- Heating return with isolating valve (m).
B
- Cold water inlet with isolating valve (p).
- Heating flow with isolating valve (q),
C
drain screw (r) and safety valve (s).
D
- Domestic hot water out.
E
- Gas service cock.
THEMA F SB 18
THEMA F SB 23 E
From left to right, the fixing jig comprises:
A
- Heating return with isolating valve (m).
- Heating flow with isolating valve (q),
C
drain screw (r) and safety valve (s).
E
- Gas service cock.
Diagram 5

DOMESTIC HOT WATER SYSTEM DESIGN

• Copper tubing or plastic Hep
for the domestic hot water system. Unnecessary
pressure losses should be avoided.
• The boiler may operate with a minimum supply
pressure of 0,3 bar but under a reduced flow rate.
Optimum performance will be obtained from a
supply pressure of 1 bar.
m
2
1
p
4
3
A
5
B
C
D
m
2
1
p
A
5
C
O may be used
2
r
q
s
6
7
E
r
q
s
7
E
• The flow restrictor must be fitted in the cold wa-
ter inlet during installation. This limits the flow through
the boiler to a maximum of 12 l/min.
Filters and washers :
1
- Washer
2
- Metal filter
3
- Flow regulator
4
- Plastic filter
5, 6 & 7 - Washers
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents