Prepare The Opening - GE 164D3333P159 Owner's Manual

Electric ranges coil top and radiant top models
Table of Contents

Advertisement

Installation of the range.
Read these instructions completely and carefully.
1

Prepare the Opening

Allow 1
spacing from the range to adjacent vertical walls above cooktop
1
2
surface.
Allow 30 minimum clearance between surface units and bottom of unprotected
wood or metal top cabinet, and 15 minimum between countertop and adjacent
cabinet bottom.
EXCEPTION: Installation of a listed microwave oven or cooking appliance over the cooktop shall
conform to the installation instructions packed with that appliance.
If cabinet storage is installed, reduce risk by installing a range hood that projects
horizontally a min. of 5 beyond the bottom of the cabinets. Make sure the wall
covering, countertops and cabinets around the range can withstand heat
generated by the range, oven or cooktop up to 200°F.
Wall
38
30
15
Min.
Min.
1
1
2
Min.
Wall
Outlet box
Install the
outlet box on
either side
of the C
L
Hood
5 Min.
Locate the outlet box within either shaded area.
C of range
L
7
1
2
7
Cord
Not less than the width
of the range
7
1
2
3
1
2
5
Floor
2
1
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

49-8927Coil topRadiant top

Table of Contents