Prepare The Opening - GE RB533 Owner's Manual

Electric ranges
Hide thumbs Also See for RB533:
Table of Contents

Advertisement

Installation of the range.
Read these instructions completely and carefully.
1

Prepare the Opening

² spacing from the range to adjacent vertical walls above
Allow 1
1
2
cooktop surface.
Allow 30² minimum clearance between surface units and bottom of unprotected
wood or metal top cabinet, and 15² minimum between countertop and adjacent
cabinet bottom.
EXCEPTION: Installation of a listed microwave oven or cooking appliance over the cooktop shall
conform to the installation instructions packed with that appliance.
If cabinet storage is installed, reduce risk by installing a range hood that projects
horizontally a min. of 5² beyond the bottom of the cabinets. Make sure the wall
covering, countertops and cabinets around the range can withstand heat
generated by the range, oven or cooktop up to 200°F.
30²
Min.
Wall
28
15²
Min.
²
1
1
2
Min.
Outlet box
Install the
outlet box
on either
side of
the C
L
Hood
5² Min.
Locate the outlet box within either shaded area.
Wall
²
7
1
2
Floor
Cord
Anti-Tip Bracket
(install in either rear corner)
Not less than the width
of the range
C of range
L
²
²
14
5⁄
7
1
8
2
²
3
1
2
²
2
1
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rb632Jbs03Jbs07Jbs26Jbc27Rb525 ... Show all

Table of Contents