Equipment Chamber
The equipment chamber has two vertical equipment racks installed in a back-to-back configuration. The
back-to-back equipment chamber houses the electronics and power systems and is divided into two bays.
Bay 1
The front section of the equipment chamber
fiber splice shelf, two Total Access 3000 shelves, and two Total Access 23-inch Heat Baffle and Fiber
Trays with 23-inch Fan Assemblies. The Environmental Control Unit (ECU) mounts vertically at the
middle left side of bay 1.
64192MS3KQL1-1A
(Figure
Equipment Side
1 RMU Fiber Termination Panel
Heat Baffle/ Fan Unit 2
TA3000 Shelf 2
Heat Baffle/ Fan Unit 1
TA3000 Shelf 1
Figure 1. FNC Equipment Bay 1, Electronics Chamber
Fiber Node Cabinet System Manual
1) houses the electronic equipment including the ADC
Field Side
3