RAID Subsystem DVA-16K | Installation Manual
Fig. 6.5 Installing the Controller Module Screws
6.
7.
Bosch Security System
Re-attach all the cables that were removed. These include the cables that connect to the
host and the expansion chassis, any Ethernet cable that was previously attached to the
LAN port, and any cables that were attached to the COM ports.
The system is now ready to power up.
Subsystem Maintenance | en
F.01U.027.799 | V2 | 2008.08
45